About FUTURE
A founder-led ceiling contractor, in suspended ceilings since 1990
FUTURE is a specialist contractor for suspended ceilings, gypsum board systems and interior finishing works. Its founder has done this one job since 1990.

- Founded
- 2019
- Specialising since
- 1990
- Founder
- Eng. Magdy Abd El-Wahab
- HQ
- Nasr City, Cairo
01
Eng. Magdy Abd El-Wahab, founder and owner
- Eng. Magdy Abd El-Wahab has specialised in suspended-ceiling contracting since 1990. In 2019 he set up FUTURE to take complete ceiling packages under one name: drawings, materials, crews and handover.
- The earliest projects in its portfolio, Steigenberger Ras Soma in Soma Bay and Casa Del Mar Beach Hotel in Hurghada, ran from 2019 to 2021. FUTURE has delivered five more hotel projects since, the largest being Giza Palace Hotel & Spa in Sheikh Zayed.
- He still runs the company himself. When you send a BOQ, the person who prices it is the person who has been on ceiling sites for three and a half decades.
In the trade since 1990. Running FUTURE since 2019.
02
What FUTURE does
We supply and install five systems, alone or as one package:
- Gypsum board ceilings for guest rooms, suites, corridors, lobbies, ballrooms, restaurants, spas, villas, casinos, malls and meeting rooms
- Gypsum ceiling tiles on suspended grids
- Aluminum and metal strip ceilings
- Fire-rated gypsum partitions, cement board partitions and claddings
- Decorative cornices and mouldings, including Corniches cornices and Corniches rustic finishes
Each package covers shop drawings, materials, installation crews and delivery on programme.
03
How we run a ceiling package
Our method came out of hotel work, where a late ceiling holds up every trade behind it.
Drawings before boards
We draw the ceiling before we build it. Shop drawings fix levels, setting-out and the position of every light, diffuser, sprinkler and access panel, and your consultant approves them first.
One sample, then repetition
You approve samples and a mock-up area. Every room after that is built to match it.
Built around your programme
We plan installation zone by zone around your master programme and the trades working next to us.
The founder on the job
FUTURE is founder-led. Decisions on site do not wait for a head office.
04
How we control quality
Quality on a ceiling job is decided early. These are the checks built into every package:
- Shop drawings approved by the consultant before material is ordered
- Samples and a mock-up approved before installation starts
- Installation checked against the approved drawings, area by area
- A joint snag walk with your team before handover
05
Safety on site
Ceiling work is work at height, above other trades. We follow the main contractor's site safety plan on every project.
06
Company details
- Legal name
- Future Office for False Ceiling and Decorations
- Arabic name
- فيوتشر للأسقف المعلقة والديكورات
- Established
- 2019
- Founder
- Eng. Magdy Abd El-Wahab, in suspended-ceiling contracting since 1990
- Status
- Fully registered and tax-compliant contractor
- Office
- Building 26, Block 115, Gamal El-Din El-Shayyal St, 7th District, Nasr City, Cairo, Egypt
- Regions delivered
- Red Sea Coast, North Coast, Greater Cairo
07
Projects across three regions
- Red Sea Coast: Hurghada, Sahl Hasheesh, Soma Bay, Marsa Alam
- North Coast: Almaza Bay, Marsa Matrouh
- Greater Cairo: Sheikh Zayed, Giza
Six of our seven projects are on the coast, hours from Cairo. Running crews and deliveries to remote resort sites is normal work for us.
Put us on your next tender list
Send a BOQ to price, or ask for our prequalification pack.