For hotel developers and operators

Hotel ceiling contractor: the package your hotel can open on time

FUTURE is a hotel ceiling contractor with seven hotel and resort projects behind it, on the Red Sea, the North Coast and in Giza. We supply and install every ceiling and partition system a hotel uses, and our clients have recommended us in writing for keeping to delivery dates.

Lobby at Steigenberger Ras Soma with lantern pendants and gypsum bulkheads

Steigenberger Ras SomaSoma Bay

01

Why hotel ceilings go wrong

A hotel ceiling package fails in predictable places. Room 1 and room 300 don't match because nobody fixed a standard. A corridor bulkhead clashes with a sprinkler main that nobody drew. A bathroom ceiling stains in the first humid summer. A rated corridor wall leaks fire through an unsealed penetration. And all of it lands in the last weeks before opening, when every trade is waiting on the ceilings.

Our process is built around those failure points: shop drawings coordinated with MEP, a mock-up room as the standard, the right board or metal for each room's conditions, and partitions built to the tested system.

02

Which ceiling goes where in a hotel?

The answer changes room by room. This is how the systems usually split, and where we have built each one.

AreaUsual systemWhere we have built it
Guest rooms and suitesGypsum board, MR board in bathrooms, metal strips in the wettest zonesAll seven projects
CorridorsGypsum board with bulkheads and access panels; fire-rated wallsGiza Palace, Steigenberger Ras Soma, One Almaza, Casa Del Mar
Lobby and receptionGypsum board with coves, domes and cornicesGiza Palace, Casa Del Mar
Ballroom and meeting roomsStepped gypsum ceilings with coves and lighting linesGiza Palace, Casa Del Mar (meeting rooms)
Restaurants and cafésGypsum board, feature details, metal stripsJaz Elite Asteria, Casa Del Mar
SpaMR gypsum board, metal strips in wet zonesSakhra Resort
Casino and mallGypsum board; tiles where access is neededGiza Palace
Back-of-house and officesGypsum tiles on a gridGiza Palace, Casa Del Mar

04

Can gypsum ceilings survive a Red Sea or North Coast resort?

Yes, when each room gets the right specification. Air-conditioned rooms take standard or moisture-resistant board. Bathrooms and spas take moisture-resistant board with good ventilation. The wettest and semi-open areas usually suit aluminum or metal strip ceilings, which we installed at Jaz Elite Asteria, Jaz Costa Mares and Casa Del Mar. Six of our seven projects are coastal.

05

Fire-rated walls in the same package

Corridor walls, room-to-room walls and risers usually need a fire rating. We build fire-rated gypsum partitions and cement board walls as part of the ceiling package, so the wall and the ceiling above it are built and sealed under one contract. At Giza Palace we delivered both.

06

One approved room, then every room

We build a mock-up room before full installation. The owner, the designer and the operator sign it off, and it becomes the standard every other room is checked against.

Recommended in writing

Written recommendations from our clients' project management name FUTURE as a trusted contractor. They cover our work at Marsa Mares, Casa Del Mar and One Almaza, and cite technical capability, competitive pricing and keeping to delivery dates.

07FAQ

Questions from hotel developers

FUTURE takes either the full package (ceilings, partitions and cornices) or a defined part of it, such as guest room ceilings only.

As soon as there are reflected ceiling plans. Early involvement lets us flag clashes with MEP and suggest systems for wet and coastal areas before the BOQ is frozen.

Opening date already announced?

Send your BOQ and drawings. We will return a quotation, our clarifications and a proposed installation programme.