P-04 · Case study · Almaza Bay, North Coast
One Almaza Resort: rooms and corridors floor by floor in Almaza Bay
In 2024 and 2025 FUTURE delivered the ceilings in the rooms and suites, the main building and the corridors of Building 4 on every floor at One Almaza Resort (East Hotel).
Last updated

One Almaza ResortVisualisation
- Client
- Travco Group
- Location
- Almaza Bay, North Coast
- Period
- 2024 to 2025
- Systems
- gypsum board ceilings
01
What made this package demanding
Corridor and room ceilings repeated on every floor of a building leave no room for drift: a level that wanders by a few millimetres on one floor shows up as a line of uneven bulkheads down the corridor. At the same time, FUTURE was running a second resort a short distance away in Almaza Bay, Sakhra, on the same 2024 to 2025 timeline.
02
Our scope at One Almaza
- Gypsum board ceilings in rooms and suites
- Ceilings in the main building
- Corridor ceilings in Building 4, all floors
03
How we ran the package
Repetition is where shop drawings pay for themselves. Typical floor drawings set levels and openings once, and each floor is installed and checked against them.
04
The result
Delivered in 2024 and 2025, in parallel with Sakhra Resort in the same bay.
05Case study
Gallery

Repeating one ceiling across many floors?
Send your typical floor drawings and BOQ.