For main contractors
A ceiling subcontractor in Egypt you can put on the tender list
Sublet your ceilings, partitions and cornices to one specialist. FUTURE prices your BOQ line by line, draws the package, supplies the materials, brings the crews and hands over to your programme.
01
What a FUTURE subcontract covers
- Gypsum board ceilings, including coves, bulkheads, pelmets and access panels
- Gypsum ceiling tiles on suspended grids
- Aluminum and metal strip ceilings
- Fire-rated gypsum partitions, cement board partitions and claddings
- Cornices and decorative mouldings
- Shop drawings, materials, installation crews, snagging and handover
Take the whole package or a defined part of it.
- 01/05
How do you price a ceiling package?
- 02/05
Why shop drawings come before material
- 03/05
What is a ceiling mock-up and why do hotels insist on one?
- 04/05
How installation runs on site
- 05/05
How handover works
02
How we price your BOQ
We price every line against the drawings and the specification. Anything unclear goes back to you as a written clarification with the quotation, along with our assumptions and exclusions, so your QS can level our bid against others without guessing what we left out.
- Itemised prices against your BOQ references
- Clarifications on ambiguous or conflicting items
- Assumptions (working hours, access, storage, power) and exclusions
- A proposed installation programme
The written recommendations FUTURE holds from its clients cite competitive pricing.
03
How we work under a main contractor
- We work to your master programme and your site rules
- Shop drawings go to the consultant through you
- We coordinate openings with your MEP subcontractors on the drawings, before installation
- Snags are closed and areas handed back to you zone by zone
04
What is in our prequalification pack?
Most contractors ask for the same documents before adding a subcontractor to a tender list. Ours is ready to send:
- Company profile (sanitised, no financial figures)
- Project reference list: seven hotel and resort projects with location, period and scope
- Commercial registration and tax status (documents shared privately on request, never published)
- Founder's experience summary
- Organisation chart and site team structure
- Health and safety approach
We send the pack by email to a company address.
05
Seven projects for one developer
Between 2019 and 2025 we delivered seven hotel and resort ceiling packages, four of them running at the same time in 2024 and 2025. Repeat appointments from one demanding client are the best reference a subcontractor can offer.
06FAQ
Questions from main contractors
FUTURE prices and contracts with whoever lets the package, whether that is the main contractor or the client directly.
FUTURE can price from drawings alone: we take off the quantities and return them with the quotation.
In 2024 and 2025 we ran four hotel projects in parallel.
FUTURE is a fully registered and tax-compliant Egyptian contractor. We share registration documents privately with prequalification committees on request.
Got a ceiling package to sublet?
Send the BOQ and drawings, or start with our prequalification pack.


