Ceiling and drywall contractor · Nasr City, Cairo

Suspended ceiling and gypsum board contractor in Egypt

Proven on 7 hotel and resort projects since 2019. FUTURE supplies and installs gypsum board ceilings, ceiling tiles, metal strips and fire-rated partitions for contractors and developers, with shop drawings, materials and installation crews under one contract. Founder-led, in ceilings since 1990.

Upload a BOQ or drawings. We reply with an itemised quotation or the questions we need answered first.

Hotel ballroom with a stepped gypsum ceiling, cove lighting and recessed downlights at Giza Palace Hotel & Spa

Giza Palace Hotel & SpaBallroom · Sheikh Zayed

Discipline
Ceilings & drylining
Track record
7 hotel and resort projects
Regions
Red Sea · North Coast · Greater Cairo
Next sheet
Scroll

The manufacturers behind our packages

  • Knauf
  • Golden Metal Group
  • Pharaonic

FUTURE in numbers

T-01
35+

years of founder experience

Eng. Magdy has run ceiling packages since 1990

T-02
7

hotel and resort projects

Delivered between 2019 and 2025

T-03
3

regions

Red Sea Coast, North Coast and Greater Cairo

T-04
250,000+

m² of works

In the last five years

01What we install

Every ceiling and partition system a hotel needs, from one contractor

All services

Hotels mix systems room by room. Gypsum board in the suites, tiles over the back-of-house, metal strips where the air stays wet, fire-rated walls along the corridors. We supply and install all of them, so you deal with one programme and one contractor.

  1. S-01

    Gypsum board ceilings

    Flat, stepped and curved ceilings with coves, bulkheads and curtain pelmets, for rooms, corridors, lobbies and ballrooms.

    Guest roomsBallroomsLobbies
  2. S-02

    Gypsum ceiling tiles

    Suspended grid ceilings that give your MEP teams access to everything above.

    Gypsum tilesSuspended grid
  3. S-03

    Aluminum and metal strip ceilings

    Linear metal ceilings for wet zones and coastal sites. Installed on three Red Sea resorts.

    Aluminum stripsMetal strips
  4. S-04

    Fire-rated and cement board partitions

    Fire-rated gypsum partitions, cement board partitions and claddings built to the tested system your consultant specifies.

    PartitionsCladdings
  5. S-05

    Cornices and decorative mouldings

    Corniches cornices and rustic finishes that sit on the same programme as the ceilings they frame.

    CornichesRustic finishes

03Who we work for

Built around the way your team buys a ceiling package

Sublet the whole package and manage one subcontractor

You need a ceiling price that holds and a subcontractor who turns up with drawings, materials and crews on the date in your programme.

  • Priced from your BOQ line by line, with ambiguities flagged at tender stage
  • Shop drawings coordinated with lights, diffusers, sprinklers and access panels before a single board goes up
  • Ceilings, partitions and cornices under one contract
  • Prequalification pack on request

The finish you approve on the mock-up is the finish in the last unit

On a compound or a mixed-use scheme, the risk is drift: unit 40 looks different from unit 4. Hotels taught us to build one sample, get it signed off and repeat it exactly.

  • Samples and a mock-up before installation starts
  • Gypsum board, tiles and metal strips matched to each space, from villas to retail
  • Founder-led company in the trade since 1990, registered and tax-compliant

Seven hotels for one developer, and a written recommendation for keeping to dates

Hotel ceilings are among the hardest packages in fit-out: hundreds of matching rooms, a ballroom with stepped coves, wet zones and fire separation, all against an opening date. That is the work we have done since 2019.

  • Guest rooms, suites, corridors, lobbies, ballrooms, restaurants, spas, a casino and a mall
  • Six of our seven projects sit on the Red Sea or the North Coast
  • Fire-rated partitions and cement board claddings in the same package

04Process

From BOQ to handover in five stages

How a ceiling package runs
  1. 01/05

    BOQ review and quotation

    We price your BOQ and drawings item by item and send back the clarifications with the quote.

  2. 02/05

    Shop drawings

    Our drawings fix levels, setting-out and every MEP opening before material is ordered.

  3. 03/05

    Samples and mock-up

    You approve the boards, finishes and a mock-up area. That sample becomes the standard for the job.

  4. 04/05

    Installation

    Our crews install to the approved drawings and to your programme, area by area.

  5. 05/05

    Snagging and handover

    We walk the areas with your team, close the snags and hand over.

In writing

Recommended in writing by our clients

Written recommendations from our clients' project management name FUTURE as a trusted contractor and cite technical capability, competitive pricing and keeping to delivery dates.

05FAQ

Questions buyers ask us first

More answers in the FAQ

FUTURE is a specialist contractor that supplies and installs suspended ceilings in Egypt: gypsum board ceilings, gypsum ceiling tiles, aluminum and metal strip ceilings, fire-rated gypsum and cement board partitions, and decorative cornices. We work for general contractors, real-estate developers and hotel developers.

FUTURE supplies the materials and installs them. We work on a supply-and-install basis: shop drawings, materials, installation crews and delivery to your programme, under one contract.

Our projects so far are on the Red Sea Coast (Hurghada, Sahl Hasheesh, Soma Bay, Marsa Alam), the North Coast (Almaza Bay, Marsa Matrouh) and in Greater Cairo (Sheikh Zayed, Giza). Our office is in Nasr City, Cairo. Send us your project location and we will confirm.

A BOQ and the drawings it refers to: reflected ceiling plans, sections and any partition layouts, plus the specification and your target programme. If you only have drawings, send them and we will prepare the quantities.

FUTURE works as a specialist ceiling and partition subcontractor under main contractors in Egypt. It prices the main contractor's BOQ, works to its programme and site rules, and submits shop drawings to the consultant through the main contractor.

FUTURE builds fire-rated gypsum partitions, cement board partitions and claddings. The rating comes from the tested system your consultant specifies, so we build to that system's board type, layers and framing.

It is, when the specification matches the room. Six of our seven projects are coastal. Dry rooms take standard board, wet zones need moisture-resistant board, and the most humid areas often suit aluminum or metal strip ceilings, which we installed on three Red Sea resorts.

It depends on area, ceiling complexity and how many zones can open at once. We send a proposed installation programme with the quotation and work to your master programme once appointed.

06Insights

Guides for people who buy ceiling packages

All guides

Short, practical answers for contractors, quantity surveyors and developers.

Have a BOQ on your desk?

Send it today with the drawings. You will get an itemised quotation, or a short list of the questions we need answered to give you one.