P-06 · Case study · Marsa Alam, Red Sea
Jaz Costa Mares Resort: guest rooms and metal strips in Marsa Alam
In 2021 and 2022 FUTURE delivered the guest room ceilings and metal strip ceilings in buildings H1 and H3 at Jaz Costa Mares. It is the farthest south of our projects.
Last updated

Jaz Costa Mares ResortMarsa Alam
- Client
- Travco Group
- Location
- Marsa Alam, Red Sea
- Period
- 2021 to 2022
- Systems
- gypsum board ceilings, metal strip ceilings
01
What made this package demanding
Marsa Alam is the most remote site in our portfolio, far down the Red Sea coast from Cairo and from most material suppliers. Every delivery, crew rotation and missing part costs days. The package covered guest rooms across two buildings, plus metal strip ceilings.
02
Our scope at Jaz Costa Mares
- Guest room ceilings in building H1
- Guest room ceilings in building H3
- Metal strip ceilings
03
How we ran the package
On a remote site, the shop drawings and the material schedule have to be right before the truck leaves Cairo. Typical room layouts are drawn once, materials are scheduled against them, and installation runs building by building.
04
The result
Delivered in 2021 and 2022.
05Case study
Gallery

Building far from Cairo?
Send your BOQ with the site location. Remote sites are normal work for us.